• <nav id="ljagm"><strong id="ljagm"></strong></nav>
    <table id="ljagm"></table><center id="ljagm"></center>

    • 
      
      <tfoot id="ljagm"></tfoot>
    • 久久人人爽人人爽人人片AV高清,麻豆视频在线观看免费软件,伊人精品久久久久7777,年轻内射无码视频,久久久久综合一本久道,性欧美大胆免费播放,国产免费午夜福利在线播放11,女人下边被添全过视频的网址

      News

      Welcome to follow the news and learn about industry trends

      Welding precautions for storage tanks

      Date: 2025-05-19  Hit: 437

      Welding of storage tanks

      1. Welding procedure qualification

      For steel grades used for the first time, process qualification should be carried out in accordance with the current national standards based on the steel grade, plate thickness, welding method and welding materials, etc., to determine the appropriate welding process. Welding procedure qualification adopts butt weld specimens and T-fillet weld specimens, among which butt weld specimens undergo tensile tests and transverse bending tests.

      2. Welder requirements

      For ordinary welders engaged in electrode arc welding, submerged arc welding and gas electric vertical welding, the assessment is usually conducted in accordance with GB50236-1998. Welders who pass the examination in accordance with the "Detailed Rules for the Assessment of Special Equipment Welding Operators" and obtain the qualification certificates of steel category, group and specimen classification code issued by the quality and technical supervision department can engage in welding of storage tank parts without the need for further examination.

      3. Preparations before welding

      To ensure the welding quality, the welding equipment should meet the requirements of the storage tank welding construction. For the butt welds of the tank wall with tensile strength σb≥430MPa and plate thickness ≥13mm, low-hydrogen type electrodes should be used for welding. Before welding, the welding materials should be dried and used in accordance with the product manual or the provisions of Figure 1. The low-hydrogen type welding rods after drying should be stored in an insulated cylinder at 100℃ to 150℃ and taken out as needed. It is worth mentioning that sealed flux-cored wires and sealed boxed flux-cored wires, in principle, do not need to be dried again. After drying, flux-cored wires should be cooled to room temperature before use.


      主站蜘蛛池模板: 色综合久久久无码中文字幕波多| 图片区小说区亚洲| 91无码人妻一区二区三区| 人妻中文无码久热丝袜| 久草福利视频| 汶川县| 性久久久久久久| 999久久久精品国产消防器材| 欧美成在线观看| 亚洲JAV无码| 草草浮力影院| 亚洲AV夜夜欢一区二区三区| 旅游| 国内精品视这里只有精品| 亚洲人成电影在线观看青青| 国产一级a片妓女视频| 日文字体乱码一二三四最新| 国产高清精品在线91| 最新亚洲人成网站在线影院 | 临夏市| 国产色婷婷精品综合在线| 国产成人涩涩涩视频在线观看| 色婷婷在线视频| 青青草国产精品亚洲专区无码| 池州市| 少妇乳大丰满在线播放| 手机在线观看| 高清国产视频久久久| 日韩精品无码专区免费播放| 玖玖在线精品免费视频| 亚洲一区二区三区四区| 欧美精品一级AAAA片| 久久午夜无码免费| 国产色无码精品视频国产| 国产成人精品久久久久精品日日| 狠狠亚洲婷婷综合色香五月排名| 熟女性饥渴一区二区三区| 啦啦啦中文在线观看日本| 人人澡 人人澡 人人看| 乱人伦中文无码视频| 亚洲成A∨人片在线观看不卡|