• <nav id="ljagm"><strong id="ljagm"></strong></nav>
    <table id="ljagm"></table><center id="ljagm"></center>

    • 
      
      <tfoot id="ljagm"></tfoot>
    • 久久人人爽人人爽人人片AV高清,麻豆视频在线观看免费软件,伊人精品久久久久7777,年轻内射无码视频,久久久久综合一本久道,性欧美大胆免费播放,国产免费午夜福利在线播放11,女人下边被添全过视频的网址

      News

      Welcome to follow the news and learn about industry trends

      Welding precautions for storage tanks

      Date: 2025-05-19  Hit: 557

      Welding of storage tanks

      1. Welding procedure qualification

      For steel grades used for the first time, process qualification should be carried out in accordance with the current national standards based on the steel grade, plate thickness, welding method and welding materials, etc., to determine the appropriate welding process. Welding procedure qualification adopts butt weld specimens and T-fillet weld specimens, among which butt weld specimens undergo tensile tests and transverse bending tests.

      2. Welder requirements

      For ordinary welders engaged in electrode arc welding, submerged arc welding and gas electric vertical welding, the assessment is usually conducted in accordance with GB50236-1998. Welders who pass the examination in accordance with the "Detailed Rules for the Assessment of Special Equipment Welding Operators" and obtain the qualification certificates of steel category, group and specimen classification code issued by the quality and technical supervision department can engage in welding of storage tank parts without the need for further examination.

      3. Preparations before welding

      To ensure the welding quality, the welding equipment should meet the requirements of the storage tank welding construction. For the butt welds of the tank wall with tensile strength σb≥430MPa and plate thickness ≥13mm, low-hydrogen type electrodes should be used for welding. Before welding, the welding materials should be dried and used in accordance with the product manual or the provisions of Figure 1. The low-hydrogen type welding rods after drying should be stored in an insulated cylinder at 100℃ to 150℃ and taken out as needed. It is worth mentioning that sealed flux-cored wires and sealed boxed flux-cored wires, in principle, do not need to be dried again. After drying, flux-cored wires should be cooled to room temperature before use.


      主站蜘蛛池模板: 天天爽夜夜欢| 真人做人试看60分钟免费视频| 91精品蜜臀国产综合久久久久久| 色依依av在线| 亚洲av色图一区二区三区| 色噜噜亚洲黑人www视频| 欧美人与人动人物2020 | 亚洲精品一区二区口爆| 日韩人妻无码专区一本| 亚洲裸男gv网站| 乱子真实露脸刺激对白| 亚洲国产精| 国产成人亚洲影院在线| 欧美搡bbbbb搡bbbbb| 中国一级毛片视频免费看| 91精品久久久久久久综合五月| 人妻少妇啊灬啊灬用力啊快 | 无码日韩精品一区二区免费漫画| 女高中生强奷系列在线播放| 亚洲s色大片在线观看| 国产香蕉在线视频| 久久久免费配对黄色片| 国产成人一区二区免费不卡视频 | 伊人久久大香线蕉av最新午夜| 国产精品自在在线午夜福利| 亚洲色欲色欲www成人网| аⅴ天堂国产最新版在线中文| 99中文字幕久久| 久久无码人妻丰满熟妇区毛片| 97国产露脸精品国产麻豆| 精品人妻伦九区久久AAA片| 公天天吃我奶躁我的在线观看| 亚洲天堂自拍| 91色国产| 波多野结衣在线播放| 无码视频一区二区三区| 国产VIVODESHD精品| 女同互慰高潮呻吟免费播放| 精品无人区卡卡二卡三乱码| jizz国产精品| 亚洲一级毛片色色色|